Kinetic Machine Works Projects

Siggi Oliver

Built a 65 ft. long 80,000 lbs tug boat for Manitoba Infrastructure and Transportation Canada. All mechanical, electrical and structural work was completed in-house.

Dallas Faye

Built a 60 ft. long 68,000 lb work vessel for a local hydro company. Overhaul replacing 80% of the vessel, doing all the mechanical, electrical, structural welding, sand blasting, painting and machining in-house.

Jerzie-James

Built a 80 ft. long work barge and commissioned it at Notigi, Manitoba for a local hydro company.

Saskatchewan Cable Ferry

80 % hull refit

Craneway Door at Point du bois Dam

Designed, manufactured and installed a new craneway opening door.

Gerdau MRM Steel

Building industrial equipment, stairs, catwalks, Billet Bay platform project with 750 ft. of platforms, ladle roofs, scrap buckets with parts weighting up to 48,000 lbs. Plus many other projects over the last 12 years. Projects ranged in size from small to millions per year.

If you would like a tour of our facilities and current projects of similar size and weight, please give us a call at 204-785-1536.